Image Alt
Helping NJ Hospitals Continue Saving Lives

Jersey City Medical Center

For several years, Orange Flood Control, LLC has helped Jersey City Medical Center (JCMC) and several other prominent NJ hospitals protect against storm damage.

HOSPITALS

Phase 1

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Phase 1

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

VIEW BY YEAR

2019   2020  •  2021  •  2022    2023  •  2024

2024

Seamless Installation, On-Site Testing, Deployment Training

In 2024, Orange Flood Control, LLC continues to help Jersey City Medical Center minimize risk and prevent damage with turn-key flood mitigation devices. Our solution-driven flood mitigation services have helped JCMC keep essential facilities, pedestrian access, and vulnerable entrances operational until flooding risks are imminent.

2023

Design & Consulting, Flood Device Selection, Maintenance & Service

In 2023, the OFC Team helped Jersey City Medical Center secure their loading docks, garage doors, and facility exterior – without negatively impacting architectural design and aesthetics.

2022

Flood Device Selection, Quality Fabrication, Site Prep, Seamless Installation

In 2022, our flood device selection, quality fabrication, site prep, and seamless installation services helped defend Jersey City Medical Center from imminent flooding risks – keeping critical healthcare utilities, appliances, and equipment protected from damage.

2021

Design & Consulting, Seamless Installation, Demolition & Site Prep, On-Site Testing

In 2023, the OFC Team helped Jersey City Medical Center secure their loading docks, garage doors, and facility exterior – without negatively impacting architectural design and aesthetics.

2020

Design & Consulting, Seamless Installation, Demolition & Site Prep, On-Site Testing

In 2023, the OFC Team helped Jersey City Medical Center secure their loading docks, garage doors, and facility exterior – without negatively impacting architectural design and aesthetics.

2019

Design & Consulting, Seamless Installation, Demolition & Site Prep, On-Site Testing

In 2023, the OFC Team helped Jersey City Medical Center secure their loading docks, garage doors, and facility exterior – without negatively impacting architectural design and aesthetics.

Contact Us

 

Give Us A Call

Experienced flood mitigation experts are standing by

+1.201.746.0921

CLICK TO CALL

Send An Email

We look forward to handling your flood prevention and mitigation needs

Sales@OrangeFloodControl.com

SEND AN EMAIL