FLOOD DEVICE: Flexible Flood Gate
SCOPE OF WORK: Design, Supply, Installation
INDUSTRY: Critical Infrastructure
Crane & Rigging Logistics
The OFC team orchestrates safe, calculated lifting, rigging, and securing solutions for large-scale projects. With narrow timeframes and multi-layered construction schedules, on-site logistics can make the difference in a successful project. Trust our team to deliver a seamless, organized experience from start to finish.
Coordinated Overnight Work
The OFC Team was given a 4-hour window to get a new vertical deploy flood barrier installed from side to side over the NYC Subway tracks. Our team worked through the night to get the job done in just 2 hours, so train systems could be up and running for peak morning commuting and revenue generation.
Expert Water Testing Services
The OFC Team conducted a successful water test on this vertical deploy barrier for the NYC Subway System. With a custom 4 ft high by 27 ft wide containment tank, the deployed barrier kept the tracks dry with minimal leakage.